Explore the collection
Trade coordination
Coordinate samples, submittals, suppliers and installers. Keep responsibilities clear from the first quotation to the final handoff.

-
Submittals and samples: keep selection changes traceable
How to document product selections, approve finishes, and control substitutions across exterior and interior surface scopes.
-
Exterior surface coordination: assign the interfaces
Sequencing and interface control for exterior pavers and slabs: base, drainage, waterproofing, and adjacent trades.
-
Interior coordination: join tile, stone and wet-area work
Coordinating interior porcelain, natural stone, and slab work with substrates, layouts, transitions, and other trades.
-
Outdoor kitchen scope: separate the slab from the assembly
Coordinating outdoor kitchen assemblies: framing, support, countertop slabs, cutouts, cladding, and weather exposure.
-
Surface quality control: agree on evidence before inspection
Practical inspection checkpoints for exterior and interior surface work, and how to document conformity to project requirements.
-
Surface handoff: leave records a future owner can use
What to hand over at the end of a surface project: care guides, spare material, records, and a clear maintenance plan.
-
Plan surface cutting with dust controls and site access
Bring cutting, dust controls, deliveries and separation from occupied areas into the project plan.